Mass Grading – Demolish infrastructure within the eastern portions of the Central Detention Basin and embank approximately 500K CU YD of lime modified earthen materials in this area. The scope further includes an extension of 108” RCP outflow piping and an extension of the Central Detention Basin pump station in-take piping.
Sine Qua Non | Absolutely Essential