CDWM Garfield Ridge Sewer Improvement

Construction oversight was provided for sewer improvements made along W. 52nd St., S. Natoma Ave., W. 53rd St., and W. Archer Ave. Work performed included the installation of reinforced concrete sewer pipes, water mains, ductile iron sewer pipes, tumbling basins, manholes, catch basins, and drain connections, as well as the construction of new connections to the existing sewer and concrete collar connections.