Utilities

CDWM Lamon & Laramie Sewer Improvement

Sewer improvements were made at several points along both N. Lamon Ave. and N. Laramie Ave., with work involving the installation of 3,453 lineal feet of reinforced concrete sewer, ductile iron pipes, tumbling basins, manholes, catch basins, and drain connections, as well as the construction of new connections to the existing sewer and concrete collar connections.