UTILITIES

CDWM Northwest Highway Sewer Improvement

Sewer systems were modernized along Pratt Avenue, Oshkosh Avenue, Northwest Highway, and Ozark Avenue. Improvement work included reinforced concrete sewer pipe, manholes, catch basins, and concrete collar installation; construction of 48” and 60” tumbling basins; tying into existing sewers with new connections, and installation of drain connections. Additional project work included traffic control and protection; capping and/or abandonment of existing water mains; all required excavation, trenching, grading, backfilling, and compaction of excavations; and restoration of pavements, curbs, walkways, landscaped areas.