Bridge ramps required replacement of the concrete deck, bearings, expansion joints, and wingwalls as well as structural repairs on the abutment, piers, and stringers. Work included 3,709 feet of roadway reconstruction including the HMA base and surface, PCC bridge approaches, and aggregate and paved shoulders as well as upgrade to the drainage system for both the roadway and bridges.