Select locations along I-88, including from IL 56 to east of IL 59 and between the Aurora Toll Plaza and IL 59, required construction engineering services on an as-needed basis over a 2-year duration for roadway rehabilitation. Specific work items included drainage improvements, crack filling, concrete pavement, bridge deck sealer, lighting, landscaping, signage structure repair, pavement markings, and guardrail installation.